Sample Projects


NH National Gaurd Microgrid/Solar Canopy - Strafford NH

Installation of solar canopy micro-grid incorporating National Guard campus net metering - connected via 1 mile high voltage electrical underground & duct bank. Installation of 1.2 miles of fiber optic & duct bank from canopy micro-grid to campus JACE-BMS for integration with existing National Guard Campus PV solar network to display and gather real-time and historical data. The project was a full design build and included engineering and design of the system, significant excavating and trenching, and installation of the solar carports.

USARC Microgrid - Fort Devens MA

Designed, engineered, integrated, and installed solar PV arrays and a 160 kWh BESS (Battery Energy Storage System) to integrate with an existing natural gas generator system and the Niagara JACE Building Management System network. The new components provided resiliency and sustainability of the Microgrid.

USARC Solar Carport and Building Control Integration - Riverside CA

Installation of a solar carports and connecting the onsite metering and solar carports to a JACE 9200 and integrating the system into the USAR’s EBCS system.

USARC Solar Carport - Glendale, AZ

Design and install solar carports and integrate these carports into the building controls system. Installation was from ground up and included engineering of the system, excavating and trenching. Reporting and monitoring requirements included daily, weekly, monthly, and yearly trending of generation and combined with the existing metering integration gave the USAR net usage visibility.

NH National Gaurd Energy Consulting

Complete Energy Audit of New Hampshire National Gaurd Solar and EV Charging Stations. The project covered 11 campuses and included component inventory, recommendation for improvements, and integration of net metering with the energy company.

USARC Solar Array Improvements and Repair - Saugreties NY

Upgraded existing solar installation from 20% capacity to 100% capacity by upgrading solar inverters and reconfiguring system.

Additional Projects

  • National Aeronautics and Space Administration Grant - NASA  - Mobil Tyco Solar Energy Corporation Waltham, MA & Harvard University: Design Build Electrical/Modbus Networks for the "Research & Development of Amorphous-Silicon Thin-Film Heterojunction Solar Cells”  

    National Oceanic and Atmospheric Administration NOAA Milford, CT: Design Build Secure - Cat 6 Local Area Networks ( LAN’s) - for Data Acquisition of Oceanic Research Facility

    National Oceanic and Atmospheric Administration NOAA Milford, CT: Design Build Data Networks & Mechanical  Systems to Supply & Monitor (1+ bn Gal Annually of Ocean Water for ) Aquatic Environments for Oceanic Research of Long Island Sound Crustations

    US Customs Services Gloucester Port of Entry, Gloucester, MA: Electrical/Data Systems

    Fort Devens Garrison - Training Center Devens, MA : Multiple Energy Efficiency Initiatives

    Portsmouth Naval Shipyard Kittery, ME: General Construction for Hospital Renovations 

    Portsmouth Naval Shipyard Kittery, ME: General Construction for Dental Clinic Renovations

    US Army Reserve Center USARC Londonderry, NH: Multiple Projects including 50 kW Solar PV

    US Army Reserve Center, UAARC Glendale, AZ: 105 kW Dual  Solar PV Carports

    US Army Reserve Center, USARC Cranston, RI: 105.7 kW Solar PV Ground Mount

    US Army Reserve Center, USARC Saugerties, NY: 192 kW Solar PV Retrofit

    US Army Reserve Center  USARC Devens, MA: Microgrid Integration - 25 kW Solar PV

    US Navy Operational Support Center NOSC Schenectady, NY: Access/Security Upgrades 

    US Navy Operational Support Center  NOSC Buffalo NY: Access /Security Upgrades

    US Navy Operational Support Center NOSC Syracuse, NY: Access /Security Upgrades 

    US Navy Operational Support Center  NOSC Rome, NY: Access /Security Upgrades

    US Navy Operational Support Center  NOSC Mattydale, NY: Access /Security Upgrades

    US Navy Operational Support Center NOSC Rochester, NY: Access /Security Upgrades

    US Army Reserve Center USARC Plattsburgh, NY: Solar PV/Wind/Battery/Integration

    US Army Reserve Center USARC Canton, NY:  Solar PV/Wind/Battery/Integration

    US Army Reserve Center USARC  Farrell, PA: Solar PV/Wind/Battery/Integration

    US Army Reserve Center USARC Tonawanda, NY: Solar PV/Wind/Battery/Integration

    US Army Reserve Center USARC Rotterdam, NY: Solar PV/Wind/Battery/Integration

    US Army Reserve Center USARC 95 Utica, NY: Solar PV/Wind/Battery/Integration

    US Army Reserve Center  USARC Plattsburgh, NY: Solar PV/Wind/Battery/Integration

    US Army Reserve Center USARC  Canton, NY: Solar PV/Wind/Battery/Integration

    US Army Reserve Center Pendel-Caminiti USARC Farrell, PA: Solar PV/Wind/Battery/Integ

    US Army Reserve Center  USARC Tonawanda, NY: Multiple Projects

    US Army Reserve Center USARC  AMSA Rotterdam, NY: Multiple Projects

    US Army Reserve Center USARC Utica, NY:  Multiple Projects

    US Army Reserve Center USARC New Windsor, NY: Solar PV/Wind/Battery/Integration

    US Army Reserve Center Jimmie Monteith USARC Richmond, VA: PV/Wind/Battery/Integration

    US Army Reserve Center Earnest Dervishian USARC Richmond, VA: PV/Wind/Battery/Integ

    NH National Guard Training Center Strafford, NH: Solar PV/13.200kV/Fiber Optic/Integration

    New Hampshire National Guard Nashua, NH: NHANG CHP HIMARS Design Build

    New Hampshire National Guard Littleton, NH: NHANG CHP HIMARS Design Build

    New Hampshire National Guard Lebanon, NH: NHANG CHP HIMARS Design Build

    NH National Guard Center Strafford Training CTR, NH: Solar/Net Metering/Mater Planning 

    NH National Guard  Concord, NH Aviation Support Facility: Solar/Net Metering/Master Planning 

    NH National Guard  Hillsborough, NH FMS: Solar/Net Metering/Mater Planning

    NH National Guard  Hooksett, NH FMS: Solar/Net Metering/Mater Planning 

    NH National Guard  Pembroke, NH ECTC: Solar/Net Metering/Mater Planning

    NH National Guard Pembroke RC Pembroke, NH: Solar/Net Metering/Mater Planning

    NH National Guard Rochester FMS Rochester, NH: Solar/Net Metering/Mater Planning

  • Boston Science Museum Boston MA: Capture the Wind Exhibit - Design & Build Swift Wind Turbine Power & Data Networks for Research, Development, Data Acquisition and Interaction with Exhibitors

    Worcester Polytechnic Institute WPI Waltham, MA: Design & Build Electrical & Data Networks for the Atwater Kent Engineering Wind Laboratory - Swift Wind Turbine for Data Acquisition and interactive Labs for Students

    Evergreen Solar Devens, MA: Design & Build 100 kW Solar PV Ground Mount Test Network for the Research & Development of String Ribbon (™) Polycrystalline Solar Cells

    Evergreen Solar Devens, MA: Design Build Electrical/Data Networks for String Ribbon (™) Polycrystalline Solar Cell Production Lines and Automated Data Acquisition and Automated Process Control Systems for 84 Mega Watt solar PV annual production 

    WR Grace Alewife-Cambridge, MA: Integrated Electrical and Data Networks for Laboratories for the  Development of High Performance Chemicals and Science Based Solutions for the Development of Hydride Battery and Related Battery Energy Storage Systems, BESS

    Lindt USA Stratham, NH: Design & Build Electrical/Data & Power Distribution Networks

    Lindt USA Stratham, NH: Design Build Automated Chocolate Process & Production Lines

    Jabil Circuit Billerica, MA, Defense & Aerospace Div: General Construction, Design & Build Engineering Offices and Manufacturing Facility for the Development  of Mission Critical High-Mix Low Volume Electro Mechanical Systems

    Jabil Circuit Billerica, MA, Defense & Aerospace Div:  Design & Build Multiple Automated Printed Circuit Boards (PCB’s) Production Lines for the fabrication of Surface Mount PCB’s for Mission Critical High-mix Low Volume Electro Mechanical systems

    Jabil Circuit Billerica, MA: Design & Build Multiple (Automated PCB)  Electrical/Data production Lines

  • Blouin Residence, Nottingham, NH: Design Build Solar PV and Battery Energy Storage System (BESS) to create a Sol Arc Microgrid integrated with Dual Bi-Directional Electric Vehicle (EV) Level II EV Charger Technologies, LP Gas Generator, and User Interface Dashboards for 24/7 Monitoring and Control of Sustainable Off-Grid or Grid-Tied Renewable Energy Systems